architect: Michel MALCOTTI + Catherine ROUSSEY + Thierry GHEZA

location: Salins les Bains, France

year: 2009

Closed since 1962, the salt works in Salins-les-Bain have been an important productive site since the middle ages right in the centre of the French city in the Franche Comté. When the competition for restoration of the salt works was announced in 2006, the city authorities had already set the goal of transforming it into a monument to the history of local production with the aim of restoring its original central importance, not only symbolically but in the city’s urban layout: recently made a UNESCO World Heritage Site, the site is intended not so much as a museum of salt but an open-air museum of local history. This is why Malcotti-Roussey and Gheza’s project indissolubly links the goal of protecting the salt warehouses with the goal of revealing their symbolic importance for the city, which translates into a restoration to preserve the complex’s original architecture with declaredly modern additions. Following a study conducted by experts from the Laboratoire des Monuments Historiques of the state of conservation of the walls, which recommended avoiding covering the historic walls saturated with salt so that they could continue to breathe and thus be preserved, the museum project was kept separate from its context right from the start, creating an additional interior within the interior of the building containing the museum itinerary and filtering spaces for links between different levels.

photo by Nicolas Waltefaugle
photo by Nicolas Waltefaugle

Unlike conservation projects based on retaining the invisible functions of the original construction, Malcotti-Roussey and Gheza’s installation, with its 31 cm thick cement walls, wooden flooring and steel furnishings made by hand by local craftsmen, fits into its context with the same visual impact and dignity of design. This restoration philosophy is expressed on the outside in an irreverently attractive element: a new parallelepiped that juts far out of the northern wall, made of Indaten® construction steel sheeting, recommended for its protective surface patina that makes it particularly resistant to corrosion by atmospheric agents.
Use of steel is a reference to the other building, overlooking the river and built to contain a casino, restaurant and auditorium on the site of another old salt works which was destroyed in the Second World War. Malcotti and Roussey also worked on this project, and chose the material to act as a link with the museum, improving the unity of the two buildings for different uses: three of the four walls of the casino are made with a double façade, in which the internal glass structure is protected by a decorative surface made up of steel sheets made by hand, all different, bent as if they were lightweight curtains but actually rigid, creating a strong contrast with the other building, compact and closed-in. An element which focuses the attention of anyone visiting the complex, serving to distribute museum routes and house temporary exhibitions, the block set into the Salt Museum, contrasting strongly with the broken-up old stone walls of the salt works, reveals the architects’ work and their philosophy of restoration which attempts to transform the complex from a historic heritage building to a city monument.

architect: Michel MALCOTTI + Catherine ROUSSEY + Thierry GHEZA (2 agenzie: SCP Malcotti-Roussey e Thierry Gheza architecte)
collaboratori
museography: Itinérance + Thierry Gheza
concetto, realizzazione grafica e infografica: Pascaline Minella+Christophe Gaudard
lighting: Scenergie
landscape: Fabienne Méline
heating and acustic: Image et calcul
structures: Cetel
elecrtical system: Enebat
client: Ville de Salins les Bains
location: Salins les Bains
surface: superficie costruita 668 mq prima tranche - superifcie costruita 1927 mq
design period: concorso marzo 2006 - ottobre 2007 - tre fasi
building period: inizio lavori settembre 2007 - maggio 2009 conclusione lavori prima fase
photography: Nicolas Waltefaugle