{"id":37427,"date":"2017-02-07T12:50:39","date_gmt":"2017-02-07T11:50:39","guid":{"rendered":"http:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/"},"modified":"2017-02-07T13:00:32","modified_gmt":"2017-02-07T12:00:32","slug":"office-and-administration-building-fortyseven-co","status":"publish","type":"post","link":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/","title":{"rendered":"Office and Administration Building FORTYSEVEN &amp; CO."},"content":{"rendered":"<p>The Frankfurt developer Max Baum Immobilien and the Munich investment company Competo Capital Partners purchased a site in the Frankfurt banking district that was then occupied by an office building from the Sixties. The new design came from <strong><a href=\"http:\/\/www.tektonik.net\/general-planning.html\">TEK TO NIK Architects<\/a><\/strong> and its leading designer <strong>Manfred Wenzel<\/strong>.<\/p>\n<figure id=\"attachment_37403\" aria-describedby=\"caption-attachment-37403\" style=\"width: 1280px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.area-arch.it\/wp-content\/uploads\/sites\/6\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37403\" src=\"http:\/\/www.area-arch.it\/wp-content\/uploads\/sites\/6\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47.jpg\" alt=\"photo by TEK TO NIK Architects\" width=\"1280\" height=\"854\" srcset=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47.jpg 1280w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47-150x100.jpg 150w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47-300x200.jpg 300w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47-768x512.jpg 768w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47-1024x683.jpg 1024w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47-696x464.jpg 696w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47-1068x713.jpg 1068w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/01-Ansicht-Mainzer-Landstrasse-47-630x420.jpg 630w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><figcaption id=\"caption-attachment-37403\" class=\"wp-caption-text\">photo by TEK TO NIK Architects<\/figcaption><\/figure>\n<p>They conceived an eight-storey office and administration building, approx. 40.000 sq ft plus underground car parking, that was planned to the precise requirements of its future tenants from the financial services industries. Each floor can be divided into units ranging from 2.000 sq ft up to 8,000 sq ft. Apart from the high quality and flexible design of the offices and communal parts it is the building\u2019s natural stone facade that has turned <em>FortySeven &amp; Co<\/em>. into a landmark building in Frankfurt\u2019s contemporary built landscape.<\/p>\n<figure id=\"attachment_37416\" aria-describedby=\"caption-attachment-37416\" style=\"width: 1280px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.area-arch.it\/wp-content\/uploads\/sites\/6\/2017\/02\/DSC_2850_bearb.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37416\" src=\"http:\/\/www.area-arch.it\/wp-content\/uploads\/sites\/6\/2017\/02\/DSC_2850_bearb.jpg\" alt=\"photo by TEK TO NIK Architects\" width=\"1280\" height=\"1093\" srcset=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2850_bearb.jpg 1280w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2850_bearb-300x256.jpg 300w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2850_bearb-768x656.jpg 768w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2850_bearb-1024x874.jpg 1024w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2850_bearb-696x594.jpg 696w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2850_bearb-1068x912.jpg 1068w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2850_bearb-492x420.jpg 492w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><figcaption id=\"caption-attachment-37416\" class=\"wp-caption-text\">photo by TEK TO NIK Architects<\/figcaption><\/figure>\n<p>Solid natural lime stone elements, each up to 800 kg heavy and milled by computerized 5\u2013axis CNC machinery according to the data from the architectural 3-D model, frame the 64 large scale square windows. Like a chessboard the facade&#8217;s 8 m x 8 m pattern is structured logically around the central two-storey high entrance to the building. The entire front facing Mainzer Landstrasse works as a highly thermally insulated curtain facade. A facade of that kind had never been realized in Germany before. Every detail \u2013 from the hidden drainage to the precisely calculated effect of the daylight shadows \u2013 was given utmost attention.<\/p>\n<figure id=\"attachment_37412\" aria-describedby=\"caption-attachment-37412\" style=\"width: 1280px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.area-arch.it\/wp-content\/uploads\/sites\/6\/2017\/02\/11-Bu\u0308roetage-mit-Blick-zur-Mainzer-Landstrasse.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37412\" src=\"http:\/\/www.area-arch.it\/wp-content\/uploads\/sites\/6\/2017\/02\/11-Bu\u0308roetage-mit-Blick-zur-Mainzer-Landstrasse.jpg\" alt=\"photo by TEK TO NIK Architects\" width=\"1280\" height=\"854\" srcset=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/11-Bu%CC%88roetage-mit-Blick-zur-Mainzer-Landstrasse.jpg 1280w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/11-Bu%CC%88roetage-mit-Blick-zur-Mainzer-Landstrasse-150x100.jpg 150w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/11-Bu%CC%88roetage-mit-Blick-zur-Mainzer-Landstrasse-300x200.jpg 300w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/11-Bu%CC%88roetage-mit-Blick-zur-Mainzer-Landstrasse-768x512.jpg 768w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/11-Bu%CC%88roetage-mit-Blick-zur-Mainzer-Landstrasse-1024x683.jpg 1024w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/11-Bu%CC%88roetage-mit-Blick-zur-Mainzer-Landstrasse-696x464.jpg 696w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/11-Bu%CC%88roetage-mit-Blick-zur-Mainzer-Landstrasse-1068x713.jpg 1068w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/11-Bu%CC%88roetage-mit-Blick-zur-Mainzer-Landstrasse-630x420.jpg 630w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><figcaption id=\"caption-attachment-37412\" class=\"wp-caption-text\">photo by TEK TO NIK Architects<\/figcaption><\/figure>\n<p>The striking <em>moir\u00e9<\/em> effect is created by each of the 3 m long three dimensional pilaster strips that project up to 40 cm. Either a projecting or a recessing &#8220;star&#8221; in the form of a node, configured of four crossing pilaster strips, makes up the basic structure of the facade&#8217;s underlying pattern. Viewed from different perspectives the facade appears to &#8220;move&#8221; in a wavelike rhythm \u2013 that is even more striking as the total weight of the facade comes up to 116 tons of solid Portuguese lime stone.<br \/>\n<em>FortySeven &amp; Co<\/em>. was completed during spring 2015 and has been awarded the German Natural Stone Prize, 2015. It has also gained the distinction &#8220;Winning Product\u201c at the Iconic Award, 2015.<\/p>\n<div id='gallery-1' class='gallery galleryid-37427 gallery-columns-3 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/02-ehemalige-situation-mainzer-landstrasse-47\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/02-Ehemalige-Situation-Mainzer-Landstrasse-47-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-37404\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-37404'>\n\t\t\t\tphoto by TEK TO NIK Architects\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/dsc_2867\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-37418\" srcset=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867-150x100.jpg 150w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867-300x200.jpg 300w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867-768x512.jpg 768w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867-1024x683.jpg 1024w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867-696x464.jpg 696w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867-1068x713.jpg 1068w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867-630x420.jpg 630w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/DSC_2867.jpg 1280w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-37418'>\n\t\t\t\tphoto by TEK TO NIK Architects\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/13-vertikale-fassadenansicht\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-37414\" srcset=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht-150x100.jpg 150w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht-300x200.jpg 300w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht-768x512.jpg 768w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht-1024x683.jpg 1024w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht-696x464.jpg 696w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht-1068x713.jpg 1068w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht-630x420.jpg 630w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/13-Vertikale-Fassadenansicht.jpg 1280w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-37414'>\n\t\t\t\tphoto by TEK TO NIK Architects\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/08-fassadendetail-lisenen\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-37409\" srcset=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen-150x100.jpg 150w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen-300x200.jpg 300w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen-768x512.jpg 768w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen-1024x683.jpg 1024w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen-696x464.jpg 696w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen-1068x713.jpg 1068w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen-630x420.jpg 630w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/08-Fassadendetail-Lisenen.jpg 1280w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-37409'>\n\t\t\t\tphoto by TEK TO NIK Architects\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/12-lisenenstruktur\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-37413\" srcset=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur-150x100.jpg 150w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur-300x200.jpg 300w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur-768x512.jpg 768w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur-1024x683.jpg 1024w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur-696x464.jpg 696w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur-1068x713.jpg 1068w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur-630x420.jpg 630w, https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/12-Lisenenstruktur.jpg 1280w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-37413'>\n\t\t\t\tphoto by TEK TO NIK Architects\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/07-5-achs-fertigungstechnik-der-natursteinelemente\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/07-5-Achs-Fertigungstechnik-der-Natursteinelemente-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-37408\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-37408'>\n\t\t\t\tphoto by TEK TO NIK Architects\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/05-fassadendetail\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/05-Fassadendetail-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-37406\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-37406'>\n\t\t\t\tfa\u00e7ade detail\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/06-fassadendetail-sockel\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/06-Fassadendetail-Sockel-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-37407\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-37407'>\n\t\t\t\tfa\u00e7ade detail\n\t\t\t\t<\/figcaption><\/figure>\n\t\t<\/div>\n\n<p><strong>client:<\/strong> Projektgesellschaft Mainzer Landstrasse 47, Max Baum Immobilien, Frankfurt\/Main<br \/>\nCompeto Capital Partners GmbH, Munich<br \/>\n<strong>architect:\u00a0<\/strong>TEK TO NIK Architekten und Generalplaner GmbH, Manfred Wenzel, Frankfurt\/Main<br \/>\n<strong>structural engineer:<\/strong> Bollinger &amp; Grohmann GmbH, Frankfurt\/Main<br \/>\n<strong>management:<\/strong> Dobberstein Architects, Frankfurt\/Main<br \/>\n<strong>natural stone fa\u00e7ade:<\/strong> Hofmann Naturstein GmbH &amp; CO. KG, Werbach-Gamburg<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Frankfurt developer Max Baum Immobilien and the Munich investment company Competo Capital Partners purchased a site in the Frankfurt banking district that was then occupied by an office building from the Sixties. The new design came from TEK TO NIK Architects and its leading designer Manfred Wenzel. They conceived an eight-storey office and administration<\/p>\n","protected":false},"author":2581,"featured_media":37411,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[52],"tags":[5236,5237,5238,5239,5240],"class_list":["post-37427","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture","tag-curtain-wall-en","tag-facade-en","tag-frankfurt-en","tag-manfred-wenzel-en","tag-tek-to-nik-architekten-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Office and Administration Building FORTYSEVEN &amp; CO. | Area<\/title>\n<meta name=\"description\" content=\"The Frankfurt developer Max Baum Immobilien and the Munich investment company Competo Capital Partners purchased a site in the Frankfurt banking district\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Office and Administration Building FORTYSEVEN &amp; CO. | Area\" \/>\n<meta property=\"og:description\" content=\"The Frankfurt developer Max Baum Immobilien and the Munich investment company Competo Capital Partners purchased a site in the Frankfurt banking district\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/\" \/>\n<meta property=\"og:site_name\" content=\"Area\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Area.Arch\" \/>\n<meta property=\"article:published_time\" content=\"2017-02-07T11:50:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-02-07T12:00:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"854\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ilaria Rondina\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ilaria Rondina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/\"},\"author\":{\"name\":\"Ilaria Rondina\",\"@id\":\"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e\"},\"headline\":\"Office and Administration Building FORTYSEVEN &amp; CO.\",\"datePublished\":\"2017-02-07T11:50:39+00:00\",\"dateModified\":\"2017-02-07T12:00:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/\"},\"wordCount\":440,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg\",\"keywords\":[\"curtain wall\",\"fa\u00e7ade\",\"Frankfurt\",\"Manfred Wenzel\",\"TEK TO NIK Architekten\"],\"articleSection\":[\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/\",\"url\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/\",\"name\":\"Office and Administration Building FORTYSEVEN &amp; CO. | Area\",\"isPartOf\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg\",\"datePublished\":\"2017-02-07T11:50:39+00:00\",\"dateModified\":\"2017-02-07T12:00:32+00:00\",\"author\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e\"},\"description\":\"The Frankfurt developer Max Baum Immobilien and the Munich investment company Competo Capital Partners purchased a site in the Frankfurt banking district\",\"breadcrumb\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#primaryimage\",\"url\":\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg\",\"contentUrl\":\"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg\",\"width\":1280,\"height\":854,\"caption\":\"photo by TEK TO NIK Architects\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.area-arch.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Architecture\",\"item\":\"https:\/\/www.area-arch.it\/en\/category\/architecture\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Office and Administration Building FORTYSEVEN &amp; CO.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.area-arch.it\/en\/#website\",\"url\":\"https:\/\/www.area-arch.it\/en\/\",\"name\":\"Area\",\"description\":\"rivista di architettura e arti del progetto\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.area-arch.it\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e\",\"name\":\"Ilaria Rondina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g\",\"caption\":\"Ilaria Rondina\"},\"url\":\"https:\/\/www.area-arch.it\/en\/author\/irondina\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Office and Administration Building FORTYSEVEN &amp; CO. | Area","description":"The Frankfurt developer Max Baum Immobilien and the Munich investment company Competo Capital Partners purchased a site in the Frankfurt banking district","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/","og_locale":"en_US","og_type":"article","og_title":"Office and Administration Building FORTYSEVEN &amp; CO. | Area","og_description":"The Frankfurt developer Max Baum Immobilien and the Munich investment company Competo Capital Partners purchased a site in the Frankfurt banking district","og_url":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/","og_site_name":"Area","article_publisher":"https:\/\/www.facebook.com\/Area.Arch","article_published_time":"2017-02-07T11:50:39+00:00","article_modified_time":"2017-02-07T12:00:32+00:00","og_image":[{"width":1280,"height":854,"url":"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg","type":"image\/jpeg"}],"author":"Ilaria Rondina","twitter_misc":{"Written by":"Ilaria Rondina","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#article","isPartOf":{"@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/"},"author":{"name":"Ilaria Rondina","@id":"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e"},"headline":"Office and Administration Building FORTYSEVEN &amp; CO.","datePublished":"2017-02-07T11:50:39+00:00","dateModified":"2017-02-07T12:00:32+00:00","mainEntityOfPage":{"@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/"},"wordCount":440,"commentCount":0,"image":{"@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#primaryimage"},"thumbnailUrl":"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg","keywords":["curtain wall","fa\u00e7ade","Frankfurt","Manfred Wenzel","TEK TO NIK Architekten"],"articleSection":["Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/","url":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/","name":"Office and Administration Building FORTYSEVEN &amp; CO. | Area","isPartOf":{"@id":"https:\/\/www.area-arch.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#primaryimage"},"image":{"@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#primaryimage"},"thumbnailUrl":"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg","datePublished":"2017-02-07T11:50:39+00:00","dateModified":"2017-02-07T12:00:32+00:00","author":{"@id":"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e"},"description":"The Frankfurt developer Max Baum Immobilien and the Munich investment company Competo Capital Partners purchased a site in the Frankfurt banking district","breadcrumb":{"@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#primaryimage","url":"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg","contentUrl":"https:\/\/static.tecnichenuove.it\/areaarch\/2017\/02\/10-Lisenenstruktur-mit-Hoch-und-Tiefpunkten.jpg","width":1280,"height":854,"caption":"photo by TEK TO NIK Architects"},{"@type":"BreadcrumbList","@id":"https:\/\/www.area-arch.it\/en\/office-and-administration-building-fortyseven-co\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.area-arch.it\/en\/"},{"@type":"ListItem","position":2,"name":"Architecture","item":"https:\/\/www.area-arch.it\/en\/category\/architecture\/"},{"@type":"ListItem","position":3,"name":"Office and Administration Building FORTYSEVEN &amp; CO."}]},{"@type":"WebSite","@id":"https:\/\/www.area-arch.it\/en\/#website","url":"https:\/\/www.area-arch.it\/en\/","name":"Area","description":"rivista di architettura e arti del progetto","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.area-arch.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e","name":"Ilaria Rondina","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g","caption":"Ilaria Rondina"},"url":"https:\/\/www.area-arch.it\/en\/author\/irondina\/"}]}},"_links":{"self":[{"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/posts\/37427","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/users\/2581"}],"replies":[{"embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/comments?post=37427"}],"version-history":[{"count":2,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/posts\/37427\/revisions"}],"predecessor-version":[{"id":37430,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/posts\/37427\/revisions\/37430"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/media\/37411"}],"wp:attachment":[{"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/media?parent=37427"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/categories?post=37427"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/tags?post=37427"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}