{"id":25165,"date":"2014-07-19T17:31:50","date_gmt":"2014-07-19T15:31:50","guid":{"rendered":"http:\/\/www.area-arch.it\/amsterdam-complex-2\/"},"modified":"2016-03-22T16:09:26","modified_gmt":"2016-03-22T15:09:26","slug":"amsterdam-complex","status":"publish","type":"post","link":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/","title":{"rendered":"Amsterdam Complex"},"content":{"rendered":"<p>The Amsterdam complex did not really begin as one: the projects began to be linked one to the other in the course of time, and during the progressive construction of the buildings. Being able to work in adjoining lots adds potential to opportunities isolated projects lack, such as views from one property to the other, recesses in the fa\u00e7ades that provide diagonal views through the neighboring property. As regards the city, it\u2019s important to transgress the boundaries between public and private, and bet that the urban fabric comes out winning in such operations, with the creation of semi-public spaces that link the inner section of a block and create a pedestrian bridge between the two avenues, especially in this case, where the higher real estate value of Amsterdam Avenue can raise the depressed value of Insurgentes Avenue, and in this way transmits, as if by contagion, the Condesa neighborhood urban regeneration process to its perimeter.<\/p>\n<div id='gallery-1' class='gallery galleryid-25165 gallery-columns-3 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/2-fachada-conj-amsterdam-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/2.-fachada-Conj-Amsterdam-2-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24940\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24940'>\n\t\t\t\tphoto by JSa\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/3-centro-qi-noche\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/3.Centro-Qi-noche-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24941\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24941'>\n\t\t\t\tphoto by JSa\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/12-centro-qi-vista-muro-de-escala-1\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/12.Centro-Qi.-vista-muro-de-escala-1-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24943\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24943'>\n\t\t\t\tphoto by JSa\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/14-amst-315-fachada\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/14.-Amst-315.-fachada-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24944\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24944'>\n\t\t\t\tphoto by JSa\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/15-amst-315-patio-1\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/15.-Amst-315.-patio-1-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24945\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24945'>\n\t\t\t\tphoto by JSa\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/25-passaje-entre-amst-309-y-315\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/25.-passaje-entre-amst-309-y-315-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24946\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24946'>\n\t\t\t\tphoto by JSa\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/28-vista-desde-amst-309-hacia-el-patio-central\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/28.-vista-desde-Amst-309-hacia-el-patio-central-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24947\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24947'>\n\t\t\t\tphoto by JSa\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/amsterdam-complex-site-plan-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Amsterdam-complex-site-plan-2-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24949\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24949'>\n\t\t\t\tsite plan\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/access-floor-plan\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Access-floor-plan-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24948\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24948'>\n\t\t\t\tAmsterdam 309 building  &#8211; ground floor plan\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/level-1-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-1-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24950\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24950'>\n\t\t\t\tAmsterdam 309 building &#8211;  first floor plan\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/level-2-3\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-2-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24951\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24951'>\n\t\t\t\tAmsterdam 309 building &#8211;  second floor plan\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/longitudinal-s0ection\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Longitudinal-s0ection-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24953\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24953'>\n\t\t\t\tAmsterdam 309 building &#8211; longitudinal section\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/level-3-3\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-3-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24952\" srcset=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-3-150x100.jpg 150w, https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-3-768x518.jpg 768w, https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-3-1024x691.jpg 1024w, https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-3-696x470.jpg 696w, https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-3-1068x721.jpg 1068w, https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-3-622x420.jpg 622w, https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Level-3.jpg 1280w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24952'>\n\t\t\t\tAmsterdam 315 building &#8211; plan level 3\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/longitudinales-section\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/longitudinales-Section-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24955\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24955'>\n\t\t\t\tAmsterdam 315 building &#8211; longitudinal section\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/longitudinal-section\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Longitudinal-Section-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24954\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24954'>\n\t\t\t\tQi Sports Centre &#8211; longitudinal section\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.area-arch.it\/en\/amsterdam-complex\/planta-de-acceso\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"100\" src=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/Planta-de-acceso-150x100.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-24956\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-24956'>\n\t\t\t\tQi Sports Centre &#8211; ground floor plan\n\t\t\t\t<\/figcaption><\/figure>\n\t\t<\/div>\n\n<p>Headed by Javier Sanchez, Alvaro Becker and Santiago Sanchez, <a href=\"http:\/\/www.jsa.com.mx\" target=\"_blank\">JS\u00aa<\/a> was created in 2007, (previously Higuera + Sanchez, created in 1996). With 14 years of experience and more than 40 national and international awards, JS\u00aa focuses on architecture, interior design and construction as well as design, sales and marketing of innovative real estate projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Amsterdam complex did not really begin as one: the projects began to be linked one to the other in the course of time, and during the progressive construction of the buildings. Being able to work in adjoining lots adds potential to opportunities isolated projects lack, such as views from one property to the other,<\/p>\n","protected":false},"author":2581,"featured_media":24942,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17],"tags":[],"class_list":["post-25165","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-no-category"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Amsterdam Complex | Area<\/title>\n<meta name=\"description\" content=\"The Amsterdam complex did not really begin as one: the projects began to be linked one to the other in the course of time, and during the progressive\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Amsterdam Complex | Area\" \/>\n<meta property=\"og:description\" content=\"The Amsterdam complex did not really begin as one: the projects began to be linked one to the other in the course of time, and during the progressive\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/\" \/>\n<meta property=\"og:site_name\" content=\"Area\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Area.Arch\" \/>\n<meta property=\"article:published_time\" content=\"2014-07-19T15:31:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-03-22T15:09:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"1601\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ilaria Rondina\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ilaria Rondina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/\"},\"author\":{\"name\":\"Ilaria Rondina\",\"@id\":\"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e\"},\"headline\":\"Amsterdam Complex\",\"datePublished\":\"2014-07-19T15:31:50+00:00\",\"dateModified\":\"2016-03-22T15:09:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/\"},\"wordCount\":210,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg\",\"articleSection\":[\"No category\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/\",\"url\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/\",\"name\":\"Amsterdam Complex | Area\",\"isPartOf\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg\",\"datePublished\":\"2014-07-19T15:31:50+00:00\",\"dateModified\":\"2016-03-22T15:09:26+00:00\",\"author\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e\"},\"description\":\"The Amsterdam complex did not really begin as one: the projects began to be linked one to the other in the course of time, and during the progressive\",\"breadcrumb\":{\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#primaryimage\",\"url\":\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg\",\"contentUrl\":\"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg\",\"width\":1280,\"height\":1601,\"caption\":\"photo by JSa\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.area-arch.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"No category\",\"item\":\"https:\/\/www.area-arch.it\/en\/category\/no-category\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Amsterdam Complex\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.area-arch.it\/en\/#website\",\"url\":\"https:\/\/www.area-arch.it\/en\/\",\"name\":\"Area\",\"description\":\"rivista di architettura e arti del progetto\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.area-arch.it\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e\",\"name\":\"Ilaria Rondina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g\",\"caption\":\"Ilaria Rondina\"},\"url\":\"https:\/\/www.area-arch.it\/en\/author\/irondina\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Amsterdam Complex | Area","description":"The Amsterdam complex did not really begin as one: the projects began to be linked one to the other in the course of time, and during the progressive","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/","og_locale":"en_US","og_type":"article","og_title":"Amsterdam Complex | Area","og_description":"The Amsterdam complex did not really begin as one: the projects began to be linked one to the other in the course of time, and during the progressive","og_url":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/","og_site_name":"Area","article_publisher":"https:\/\/www.facebook.com\/Area.Arch","article_published_time":"2014-07-19T15:31:50+00:00","article_modified_time":"2016-03-22T15:09:26+00:00","og_image":[{"width":1280,"height":1601,"url":"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg","type":"image\/jpeg"}],"author":"Ilaria Rondina","twitter_misc":{"Written by":"Ilaria Rondina","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#article","isPartOf":{"@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/"},"author":{"name":"Ilaria Rondina","@id":"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e"},"headline":"Amsterdam Complex","datePublished":"2014-07-19T15:31:50+00:00","dateModified":"2016-03-22T15:09:26+00:00","mainEntityOfPage":{"@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/"},"wordCount":210,"commentCount":0,"image":{"@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#primaryimage"},"thumbnailUrl":"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg","articleSection":["No category"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/","url":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/","name":"Amsterdam Complex | Area","isPartOf":{"@id":"https:\/\/www.area-arch.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#primaryimage"},"image":{"@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#primaryimage"},"thumbnailUrl":"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg","datePublished":"2014-07-19T15:31:50+00:00","dateModified":"2016-03-22T15:09:26+00:00","author":{"@id":"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e"},"description":"The Amsterdam complex did not really begin as one: the projects began to be linked one to the other in the course of time, and during the progressive","breadcrumb":{"@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.area-arch.it\/en\/amsterdam-complex\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#primaryimage","url":"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg","contentUrl":"https:\/\/static.tecnichenuove.it\/areaarch\/2016\/03\/4.Centro-Qi.-espacio-dobre-fachada.jpg","width":1280,"height":1601,"caption":"photo by JSa"},{"@type":"BreadcrumbList","@id":"https:\/\/www.area-arch.it\/en\/amsterdam-complex\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.area-arch.it\/en\/"},{"@type":"ListItem","position":2,"name":"No category","item":"https:\/\/www.area-arch.it\/en\/category\/no-category\/"},{"@type":"ListItem","position":3,"name":"Amsterdam Complex"}]},{"@type":"WebSite","@id":"https:\/\/www.area-arch.it\/en\/#website","url":"https:\/\/www.area-arch.it\/en\/","name":"Area","description":"rivista di architettura e arti del progetto","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.area-arch.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.area-arch.it\/en\/#\/schema\/person\/859d30cbc6451ba1e9eee38c16866a0e","name":"Ilaria Rondina","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/06882c37cdcdeac21f7348c6bd79ef252559575de5fed49831ef23c3bc3614ac?s=96&d=mm&r=g","caption":"Ilaria Rondina"},"url":"https:\/\/www.area-arch.it\/en\/author\/irondina\/"}]}},"_links":{"self":[{"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/posts\/25165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/users\/2581"}],"replies":[{"embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/comments?post=25165"}],"version-history":[{"count":1,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/posts\/25165\/revisions"}],"predecessor-version":[{"id":25166,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/posts\/25165\/revisions\/25166"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/media\/24942"}],"wp:attachment":[{"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/media?parent=25165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/categories?post=25165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.area-arch.it\/en\/wp-json\/wp\/v2\/tags?post=25165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}